登录/
注册
题库分类
下载APP
帮助中心
首页
考试
搜题
APP
当前位置:
首页
>
查试题
>
activity()
单选题
activity()
A. 演员
B. 账户
C. 活动
D. 行动
查看答案
该试题由用户830****65提供
查看答案人数:30457
如遇到问题请
联系客服
正确答案
该试题由用户830****65提供
查看答案人数:30458
如遇到问题请
联系客服
搜索
相关试题
换一换
单选题
activity()
A.演员 B.账户 C.活动 D.行动
答案
主观题
使用Android Studio创建Activity时,Activity会默认继承()类
答案
主观题
启动模式是指,每次启动该Activity时,系统会这个Activity的实例这个Activity实例对应的任务移除
答案
单选题
The extra benefit that results from carrying out one additional unit of an activity is the__ of the activity()
A.average benefit B.marginal benefit C.economic benefit D.total benefit
答案
单选题
The extra cost that results from carrying out one additional unit of an activity is the__ of the activity()
A.opportunity cost B.reservation cost C.marginal cost D.marginal benefit
答案
主观题
activity意思__
答案
多选题
在Activity中,一个Activity跳转到另一个Activity可以通过哪几种方法跳转()。
A.startActivityForResult() B.startActivity() C.onOptions() D.onOptionsItemSelected()
答案
判断题
standard是Activity默认的启动模式,在不指定Activity启动模式的情况下,所有Activity使用的都是standard这种模式( )
答案
单选题
Do you know the activity called “________ Lights” —Oh,it’s an activity that reminds people of saving energy.
A.No, he didn’t B.Yes, he did C.Yes, he didn’t D.No, he did;
答案
单选题
Do you know the activity called “________ Lights” ?—Oh,it’s an activity that reminds people of saving energy.
A.Turn on B.Turn down C.Turn off D.Turn up
答案
热门试题
在创建Activity时,在Activity Name输入框中输入的是()
( ) is a technique for estimating the duration or cost of an activity or a project using historical data from a similar activity or project.
Site of activity for penicillin
The marginal benefit of an activity is the()
The marginal cost of an activity is the()
What activity is in October?
In a listening activity, students are asked to note down the time and places of events. The aim of this activity is to develop the skill of__________.
In a listening activity, students are asked to note down the time and places of events. The__________aim of this activity is to develop the skill of
创建一个Activity必须继承自android.app.Activity或者其子类。
estimating is a technique for estimating the duration or cost of an activity on project using historical data from a similar activity or project.
standard是Activity默认的启动模式,使用该模式的Activity,每次启动时就会在栈顶创建一个新的Activity实例
PDM includes four types of dependencies or precedence relationships: (). The completion of the successor activity depends upon the initiation of the predecessor activity.
( )estimating is a technique for estimating the duration or cost of an activity ou project using historical data from a similar activity or project.
Which of the following is not an interactive activity?
Which of the following is a communicative activity?
Which of the followings is a communicative activity?
Which of the following is a communicative activity?
Which of the following is a communicative activity
Which of the following is not an interactive activity?
Which of the following is not an interactive activity?
购买搜题卡
会员须知
|
联系客服
免费查看答案
购买搜题卡
会员须知
|
联系客服
关注公众号,回复验证码
享30次免费查看答案
微信扫码关注 立即领取
恭喜获得奖励,快去免费查看答案吧~
去查看答案
全站题库适用,可用于E考试网网站及系列App
只用于搜题看答案,不支持试卷、题库练习 ,下载APP还可体验拍照搜题和语音搜索
支付方式
首次登录享
免费查看答案
20
次
微信扫码登录
账号登录
短信登录
使用微信扫一扫登录
获取验证码
立即登录
我已阅读并同意《用户协议》
免费注册
新用户使用手机号登录直接完成注册
忘记密码
登录成功
首次登录已为您完成账号注册,
可在
【个人中心】
修改密码或在登录时选择忘记密码
账号登录默认密码:
手机号后六位
我知道了
APP
下载
手机浏览器 扫码下载
关注
公众号
微信扫码关注
微信
小程序
微信扫码关注
领取
资料
微信扫码添加老师微信
TOP