65() 材料
The mind-success connection is strong, and many obstacles to our success are also mental. Some people rely more on facts,(56) others rely more on feelings. There is no “right way” to be, but we all have the natural ability to “feel” our way successfully (57) an unlighted path.
I learned this (58) I was standing on a curb (路边) in a city in Vietnam (越南). My objective, a restaurant where my husband Tom was (59) for me, stood on the (60) side of the street, I was (61) and could smell the food. But it seemed as if the restaurant were miles away. The street was (62) with motor cycles, bicycles, cars, trucks and buses. Rather than (63) the traffic into two lanes, the yellow lane markers apparently served only to (64) that you were on a paved (铺设的) road. People passed,stopped, turned around and crossed center lines.
Traffic flowed both ways in the same lane, and more traffic turned onto the street from side ones. Even when the signal tight turned red, traffic (65) to flow as drivers entirely (66) the signal, rushing to me from front, back, sides and all angles.
I was ready to abandon lunch with Tom when a local gentleman (67) my arm. In English, he kindly said, “Crossing the street is not a problem, (68) a dance.” With that we stepped (69) the curb and into the chaos (混乱). My heart (70) faster as we walked slowly across. (71) greeting us with sharp horns and angry shouts, drivers saw and adjusted to us. As long as we made no sudden (72) , we were fine. I felt as if we were gracefully swimming (73) a school of fish. The traffic flowed smoothly around us, in all directions. (74) I knew it, we were across.
Learning to dance through the chaos of traffic is just (75) your feelings. It's a combination of intention, timing and trust.
单选题

65()

A. responded
B. trans formed
C. recovered
D. continued

查看答案
该试题由用户695****89提供 查看答案人数:25043 如遇到问题请 联系客服
正确答案
该试题由用户695****89提供 查看答案人数:25044 如遇到问题请联系客服

相关试题

换一换
单选题
● 临界区是 (65) 。(65)
A.一个缓冲区 B.一段程序 C.一段共享数据区 D.一个互斥资源
答案
单选题
● 项目成本控制是指(65) 。(65)
A.对成本费用的趋势及可能达到的水平所作的分析和推断 B.预先规定计划期内项目施工的耗费和成本要达到的水平 C.确定各个成本项目内比预计要达到的降低额和降低率 D.在项目施工成本的形成过程中,对形成成本的要素进行监督,调节和控制
答案
单选题
在滚动式计划中,(65) 。(65)
A.关注长期目标,允许短期目标作为持续活动的一部分进行滚动 B.近期要完成的工作在工作分解结构最下层详细规划 C.远期要完成的工作在工作分解结构最下层详细规划 D.为了保证项目里程碑,在战略计划阶段做好一系列详细的活动计划
答案
单选题
泵型号IS80-65-160中,65表示()。
A.泵叶轮名义直径 B.泵扬程 C.泵入口直径 D.泵出口直径
答案
单选题
IS100-65-315型中的65是指:()。
A.泵入口直径 B.泵出口直径 C.叶轮名义直径 D.单级单吸
答案
单选题
● 项目监理机构应当根据(65)开展监理活动。(65)
A.项目法人的要求 B.监理合同 C.监理大纲 D.招标文件
答案
单选题
65YT-40*30型号中“65”是指()
A.泵的扬程 B.吸入口直径 C.泵的流量
答案
单选题
你的年龄为65岁或大于65岁()
A.正确 B.错误
答案
单选题
()65  
A.where B.which C.when D.why  
答案
单选题
()65  
A.that B.when C.what D.how  
答案
购买搜题卡 会员须知 | 联系客服
会员须知 | 联系客服
关注公众号,回复验证码
享30次免费查看答案
微信扫码关注 立即领取
恭喜获得奖励,快去免费查看答案吧~
去查看答案
全站题库适用,可用于E考试网网站及系列App

    只用于搜题看答案,不支持试卷、题库练习 ,下载APP还可体验拍照搜题和语音搜索

    支付方式

     

     

     
    首次登录享
    免费查看答案20
    微信扫码登录 账号登录 短信登录
    使用微信扫一扫登录
    登录成功
    首次登录已为您完成账号注册,
    可在【个人中心】修改密码或在登录时选择忘记密码
    账号登录默认密码:手机号后六位